Getting things as far forward as possiblr before my op on Monday ...
Engine well on the way, and frame now finished. Had to lower the frame 1/2" to get filter out and cut out two BSA engine mtg lugs. Added a pair of lugs up front and two underneath to locate the new engine. Also cut off the old tired stand lugs and welded two new ones on. This morning (sun shining!) I gave her a sound coat of two pack. Hope it dries before rain ..... Apparently a shower is 20% possible.